USD/KZT 523.17  -1.41
EUR/KZT 550.06  -1.85
NEWS ARCHIVE
NEWS
Kazakh uranium mine starts

LONDON. April 28. KAZINFORM Kazakhstan's newest in-situ leach (ISL) uranium mine, Kharasan 1, has been officially opened at a ceremony attended by Kazakh, Japanese and Canadian dignitaries, Kazinform refers to World Nuclear News. The 24 April ceremony was led by Kazakh prime minister Karim Massimov and attended by official delegations headed by Japanese and Canadian diplomats, representatives from the companies involved in the Kharasan 1 project, and Kazakh dignitaries. The mine is expected to produce 180 tonnes of uranium in 2009, reaching its full capacity of 3000 tonnes of uranium per year in 2014. It is expected to operate until 2053. The mine has taken three years to build and is operated by LLP Kyzylkum, which is in turn owned by Kazakshtan's national atomic company Kazatomprom (30%), a consortium of Japanese power companies (Tepco, Marubeni, Toshiba, Chubu Electric, Tohoku Electric and Kysushu Electric, between them holding 40%), and Canadian uranium company Uranium One (30%). A total of $432 million has been invested in the project to date. Kharasan 1 is the northernmost of two uranium deposits at Kharasan, and according to Kazatomprom has been difficult to develop thanks to its situation on the bank of the Syr-Darya river in a remote, undeveloped desert area. Infrastructure developments including the construction of a bridge over the Syr-Darya river, and construction and improvements of roads, rail links and power transmission lines were completed as part of the project, as well as the construction of a field camp for 280 personnel at the mine, Kazinform cites World Nuclear News. See www.world-nuclear-news.org for full version.


Resourse: KAZINFORM







Rambler's
Top100
Rambler's Top100

  WMC     Baurzhan   Oil_Gas_ITE   Mediasystem